Laying C-Channel around the Centrifugal Compressor as the based to secure the modular wall panels | |
Once the based is secured, corner and intermediate panels are installed to make the whole enclosure more rigid. | |
Installed Doors and Roof. | |
Some cutting need to be done for pipe penetration | The penetration will be finished with flashing to make it look nice and neat. |
The completion of the Acoustic Enclosure on Centrifugal Compressor |
04 Feb 2022
We specialize in industrial noise control, oil & gas industry noise control, architectural acoustics, traffic noise control and audiometric test room.
1, Jalan Utarid U5/17, Seksyen U5, Mahsing Integrated Industrial Park, 40150 Shah Alam, Selangor, Malaysia.
© 2015-2024 ISTIQ Noise Control Sdn Bhd 199501013082 (342283-V)
Visitor :
Powered by NEWPAGES